NSCC Lunenburg Campus, Bridgewater NS
Launched in January 2021, this installation features a Fröling TM500 boiler with 500 kW of capacity. The system displaces 90% of fossil-fuel heating at both the Bridgewater Provincial Courthouse and the Provincial Building, while supplying additional heat to the NSCC Lunenburg campus.
Biomass is sourced directly from local forest restoration groups, creating a market for low-grade wood that would otherwise have no economic value.
- Fröling TM500, 500 kW capacity, high-efficiency and low-emissions
- Custom chip-unloading conveyor system designed and installed by ACFOR
- Replaces 90% of fossil fuel heating across two provincial buildings
- Greenhouse gas reductions equivalent to removing hundreds of cars from the road annually